About formula line types
Important
This content is archived and is not being updated. For the latest documentation, see Microsoft Dynamics 365 product documentation. For the latest release plans, see Dynamics 365 and Microsoft Power Platform release plans.
Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012
When you create a formula line, you use the line type to indicate how you want the program to handle the line. This is when you run master planning and producing batch orders. Each line type gives a different result. You can select from the following line types:
Line type |
Description |
Item |
Select Item when the item is a raw material or a semi-finished item that is picked from inventory or when the item is a service. |
Phantom |
Select Phantom when you want to explode any lower-level formula items that are contained in formula lines. When you estimate the batch order and the formula items are exploded, the component items are listed as formula lines in the batch order. Also, the corresponding routes are added to the production route. Formula items are exploded using the current configuration. When you use the phantom line type, you can handle production and measurement configurations that occur at different formula levels. Note If you select Phantom for a product on the Engineer FastTab in the Released product details form and then use this product in a formula, the formula line type changes to Phantom. You cannot select Phantom for a catch weight item or for items where the production type is Co-product, By-product, or Planning item. |
Pegged supply |
Select Pegged supply to create a batch order for any formula items that are contained in formula lines. The batch order is created when you estimate the batch order. The required item quantities are reserved for the batch order. |
Vendor |
Select Vendor if the production process uses a subcontractor and you want to create a sub production or a purchase order for the subcontractor. The service or work that is performed by the subcontractor must be created by using a Formula or Service item. You can attach it to the parent item as a formula line. The route must contain an operation that is assigned to the subcontractor’s operations resource. This operation is attached to the formula line using the Oper. No. field. |