About linking BOM lines to route operations

Important

This content is archived and is not being updated. For the latest documentation, see Microsoft Dynamics 365 product documentation. For the latest release plans, see Dynamics 365 and Microsoft Power Platform release plans.

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

Click Inventory management > Journals > Item transactions > Bills of materials. Select a BOM, and click the Designer button.

Use this form to link BOM lines to operation numbers. Route information for the current parent BOM is displayed in the upper-right section of the Designer tab. Where there are sub-BOMs, route information changes when you select lines.

Blue arrows in the Current route section indicate that there are direct links from the selected route to operations. Gray arrows indicate indirect links. If the operation number is blank, the system functions as if the item is used from the first operation for the parent BOM route.

You can link sub-BOMs to a specific operation by using drag-and-drop functionality. When you link a sub-BOM to an operation, the sub-BOM must be completed and ready for the parent BOM assembly process by the time that the operation starts.

Note

When you drag link lines from sub-BOMs to route operations, you must lock the parent BOM route to prevent the linking of lines to the wrong BOM route.

On the Designer tab, click the BOM line, and drag it to the specific operation number in the Current route section.

Right click the BOM line, and select whether you want to remove the link or delete it.

See also

BOM designer (form)