About order-specific BOM calculations

Important

This content is archived and is not being updated. For the latest documentation, see Microsoft Dynamics 365 product documentation. For the latest release plans, see Dynamics 365 and Microsoft Power Platform release plans.

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

An order-specific bill of materials (BOM) calculation represents a variation of a BOM calculation for a manufactured item. An order-specific BOM calculation is performed in the context of a sales order, sales quotation, or service order line item. An order-specific BOM calculation generates a calculation record that is displayed in the BOM calculation results form. The calculation record includes a calculated weight, a calculated cost that is based on active cost records, and a calculated sales price. Each order-specific BOM calculation for an item generates a calculation record in the BOM calculation results form, uniquely identified by a calculation number. The results of a calculation record can optionally be transferred to the originating line item.

An order-specific BOM calculation differs from a BOM calculation for a manufactured item. First, an order-specific BOM calculation does not generate an item cost record throughout a costing version. This results in the BOM calculation policies not applying to create an item cost record or to overwrite a cost record. Second, an order-specific BOM calculation always uses the active cost records for components, cost categories, and indirect cost calculation formulas.

See also

About BOM calculations