Standard Toolbar
The standard toolbar includes five buttons used for file management, and three window view controls, as shown in the following figure:
The file-management buttons include the following:
New
Starts a new project or adds a new component of any type to an existing project. For information about creating new projects or component files, see Project Management.
Open Project
Opens an existing project.
Insert Files
Adds files of any type to a project. This includes existing DirectMusic Producer components as well as files from inside or outside the DirectMusic Producer environment such as text files and wave files. For information about adding all types of files, see Managing Components.
Save Project
Saves changes made to the selected project.
Save File
Saves changes made to the component in the active editing module. The Save button is disabled if no component is open in an editing window.
The following buttons are used to change how windows are arranged and displayed:
Toggle Project Tree
Turns the display of the project tree on or off.
Tile Horizontally
Arranges the editing windows of the components so they line up from top to bottom without overlapping.
Tile Vertically
Arranges the editing windows so they line up side-by-side without overlapping.